How Much Does a Bathroom Remodel Cost in St. George?

Real numbers from a Southern Utah contractor, plus the one place you should never cut corners.

The Short Answer

A standard bathroom remodel in Southern Utah runs $15,000 to $25,000. That's a typical bathroom, around five feet by twelve, with a tub or tub-shower combo, a toilet, a sink, and a vanity, torn out and put back together. Converting to a large walk-in shower or building out a full primary suite costs more.

What Drives the Price

  • The shower. Tile, waterproofing, glass, and whether you're keeping a tub-shower combo or going to a custom walk-in shower. This is the biggest swing.
  • Fixtures and vanity. Quality of the vanity, countertop, faucets, and toilet.
  • Layout and plumbing. Moving the toilet, shower, or sink means new rough plumbing, which adds cost. Keeping the layout keeps it down.
  • Size and scope. A primary suite with double vanities and a separate tub and shower is a different project than a hall bath.
  • What's behind the walls. In older Southern Utah homes we sometimes open a wall and find black mold or termite damage. Fixing it is the right call, and it affects the final number.

Timeline

A standard bathroom, torn out and put back together, takes about two to four weeks. We usually tell homeowners four and often finish sooner. We do our tile work in-house or with tile setters we've used for years, so we're not waiting on a stranger's schedule.

The One Place Not to Cut Corners

The shower is where cheap work shows up. A poorly waterproofed shower leaks behind the tile and has to be torn out and redone within a few years, so you pay for it twice. Pay once, do it right. That's the whole reason to hire a contractor who has actually set tile and knows what a watertight shower takes.

Bathroom Remodel Cost FAQ

How much does a bathroom remodel cost in St. George?

A standard bathroom remodel in Southern Utah runs $15,000 to $25,000. Converting to a large walk-in shower or building a full primary suite costs more.

How long does a bathroom remodel take?

About two to four weeks for a standard bathroom, tear-out to finish. We usually quote four weeks and often come in sooner.

What's the biggest cost in a bathroom remodel?

The shower, including tile, waterproofing, and whether you're going to a custom walk-in shower. Moving plumbing also adds cost.

Why is the shower so important to get right?

A shower that isn't waterproofed correctly leaks behind the tile and has to be redone within a few years. Doing it right the first time costs less than doing it twice.

Thinking About a Bathroom Remodel?

The only way to know your real number is a walkthrough. It's free, and we'll tell you straight.